|
|
|
Required Inspections
- Sewer, water, and street openings
- Footers and basement walls prior to pouring
- All underground plumbing, heating, electric, downspout, drainage, and waterproofing of foundation before covering
- Concrete floors, walks, porches, and steps before pouring
- Rough-in electrical, plumbing, mechanical and structure before insulation or any cover installed
- Insulation
- Final inspection before occupancy or use of structure includes; finish grading, final plumbing, electrical, and heating
- Water Meter Installation
- Final Septic Approval
|
More Info
Building Permits
Participating Townships
Plan Review Requirements
Zoning Inspectors
Required Inspections
Building Permit Fee Schedule
Contractor Fee Schedule
Staff Directory
Supervision
Document Library
Related Topics
County Engineer
General Health District
RLCWA
Quick Picks
• Animal Control
• Commissioner Pages
• Lorain County Transit
• Board Appointment
• Commissioner News
• Passport Services
• County Jobs
• Photo Contest
• Vote
|
|
| |
|